Cantrabria, Spain: This phase of work on the Harry Colt design began in September and involves the redesign and rebuild of 18 bunkers, on the third, sixth, fourteenth, sixteenth and seventeenth holes. Construction is being handled by Madrid-based contractor Mafer Golf and includes the installation of Better Billy Bunker liner and Durabunker edging. (continue reading)
#MaferGolf
Comentarios